忍者ブログ
2025/04月
≪03月  1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30  05月≫
[317] [316] [315] [314] [313] [312] [311] [310] [309] [308] [307
×

[PR]上記の広告は3ヶ月以上新規記事投稿のないブログに表示されています。新しい記事を書く事で広告が消えます。

C9010-030認定試験がとても人気がある一つとして、合格するために豊富な知識と経験が必要です。
毎回に高いC9010-030受験料金を入金しました。もし、失敗したら、高いC9010-030受験料がかかります。
Passexamは最新のIBM Certified System Administrator - IBM i V1 C9010-030問題集を使用すると、楽にC9010-030試験の準備をすることができます。
弊社のIBM i V1 C9010-030勉強資料は安全かつ効率的な取引体験をするだけでなく、より多くの知識を勉強することもできます。
C9010-030認定試験情報:
IBM i Administration V1(C9010-030)は、制限時間 120分、出題数 66問、合格率 59%、受験料 30ドルのIBM Certified System Administrator - IBM i V1認定に関連する試験です。
Section 1 - Operating System Upgrades (7%)
Section 2 - PTF Management (7%)
Section 3 - Problem Determination (8%)
Section 4 - Backup Tasks (8%)
Section 5 - Recovery Tasks (8%)
Section 6 - Work Management (8%)
Section 7 - User Administration (5%)
Section 8 - Networking (6%)
Section 9 - HMC Management (5%)
Section 10 - System Firmware (FSP) (4%)
Section 11 - Performance Management and Tuning (7%)
Section 12 - Write and debug simple CL programs & queries in support of administrative tasks (5%)
Section 13 - Security & Compliance (10%)
Section 14 - Journaling & Database Management (8%)
Section 15 - IBM i Access, Access Client Solutions, & IBM Navigator for i (4%)
受験者はC9010-030問題集を購入する前に、C9010-030無料でサンプルを提供することができます。
高品質のIBM i V1 C9010-030勉強資料を知ることができ、一番良いものを選んだということも分かります。
IBM i V1 C9010-030受験対策を勉強したら、高い技能を身につけていることも証明できます。
1.A P0WER8 system with a single FSP is running firmware SV830_048. When the administrator goes to
Fix Central, the latest firmware is SV830_068_050.
What is the effect of installing this software?
A. The upgrade is disruptive because the only PowerKVM upgrades are concurrent when using OPAL.
B. Since both the installed and the new firmware are at SV830, the upgrade will be concurrent when done
from the OS.
C. The upgrade is concurrent because the 068 and the 050 are not the same number.
D. The upgrade would be disruptive as the 050 in the latest firmware is higher than the 048 currently
running on the FSP.
Answer: A
2.An administrator has bean directed to configure DDM using TCP/IP between two systems: "SYSTEM1"
and "SYSTEM2". Both systems are in the site DNS. Applications on both systems require DDM access to
files on the other system.
The administratorhas made sure that the RemoteDatabaseDirectory has the *LOCALentry configured
correctly on both systems.
What is additionally required so the communications will function correctly between the systems?
A. Add a Remote Database Directory entry for the other system
B. Add a host table entry for QDDMSERVER using address "LOOPBACK on each system
C. Add a host table entry for the local system in its hosts table
D. Change the "DDM Request Access" setting in the network attributes to QDDMSERVER
Answer: A
3.An administrator has noticed that the number of security audit journal receivers on the system is getting
unmanageable.
How can the administrator adjust the journal to still capture and retain the required journal entries but
generate fewer receivers?
A. Change the security journal to delete journal receivers.
B. Change the current journal receiver to a higher threshold value.
C. Create a new security journal specifying the number of receivers to use.
D. Create a new journal receiver setting the threshold to a higher value.
Answer: B
PR
この記事にコメントする
name
title
color
mail
URL
comment
pass   Vodafone絵文字 i-mode絵文字 Ezweb絵文字
secret (チェックを入れると管理人だけに表示できます)
プロフィール
HN:
No Name Ninja
性別:
非公開
P R

Powered by Ninja Blog    template by Temp* factory    materiai by Sweety

忍者ブログ [PR]